Designing the test environment set-up and identifying any required infrastructure and tools are a part of which phase 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Test Analysis and Design

Test Implementation and execution has which of the following major tasks?

i. Developing and prioritizing test cases, creating test data, writing test procedures and optionally preparing the test harnesses and writing automated test scripts.

ii. Creating the test suite from the test cases for efficient test execution.

iii. Verifying that the test environment has been set up correctly.

iv. Determining the exit criteria.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - i,ii,iii are true and iv is false

A Test Plan Outline contains which of the following :-

i. Test Items

ii. Test Scripts

iii. Test Deliverables

iv. Responsibilities

Correct

Well Done... 🙂

Incorrect

Correct Answer: - i,iii,iv are true and ii is false

One of the fields on a form contains a text box which accepts numeric values in the range of 18 to 25. Identify the invalid Equivalence class

Correct

Well Done... 🙂

Incorrect

Correct Answer: - 17

In an Examination, a candidate has to score the minimum of 24 marks in order to clear the exam. The maximum that he can score is 40 marks. Identify the Valid Equivalence values if the student clears the exam.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - 29,30,31

Which of the following statements regarding static testing is false:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - static testing requires the running of tests through the code

Verification involves which of the following: -

i. Helps to check that we have built product right.

ii. Helps to check that we have built the right product.

iii. Helps in developing the product.

iv. Monitoring tool wastage and obsoleteness.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - i is true and ii,iii,iv are false

Component Testing is also called as: -

i. Unit Testing

ii. Program Testing

iii. Module Testing

iv. System Component Testing.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - i,ii,iii are true and iv is false

Link Testing is also called as : 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Component Integration testing

What is the expected result for each of the following test cases?

                                                      Rule 1                   Rule 2          Rule 3            Rule 4

Conditions

Indian resident?                       False                     True             True                True

Age between 18 – 55?            Don’t care            False           True                True

Married?                                   on’t care            Don’t care     False              True

Actions

Issue Memebership?              False                     False           True                True

Offer 10% discount?                False                     False           True                 False

A. TC1: Anand is a 32 year old married, residing in Kolkatta.

B. TC3: Attapattu is a 65 year old married person, residing in Colombo.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - A – Issue membership, no discount, B – Don’t Issue membership.

Methodologies adopted while performing Maintenance Testing: -

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Breadth Test and Depth Test

Which of the following is true about Formal Review or Inspection: -

i. Led by Trained Moderator (not the author).

ii. No Pre-Meeting Preparations

iii. Formal Follow up the process.

iv. Main Objective is to find defects

Correct

Well Done... 🙂

Incorrect

Correct Answer: - i,iii,iv are true and ii is false

The Phases of formal review process is mentioned below arrange them in the correct order.

i. Planning

ii. Review Meeting

iii. Rework

iv. Individual Preparations

v. Kick Off

vi. Follow Up

Correct

Well Done... 🙂

Incorrect

Correct Answer: - i, v, iv, ii, iii, vi

 

Consider the following state transition diagram of a two-speed hair dryer, which is operated by pressing its one button. The first press of the button turns it on to Speed 1, second press to Speed 2 and the third press turns it off. Which of the following series of state transitions below will provide 0-switch coverage?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - A,B,C

White Box Techniques are also called as: - 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Structural Testing

What is an equivalence partition (also known as an equivalence class)?

Correct

Well Done... 🙂

Incorrect

Correct Answer: -An input or output range of values such that only one value in the range becomes a test case

The Test Cases Derived from use cases

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Are most useful in uncovering defects in the process flows during real world use of the system

Exhaustive Testing is

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Is impractical but possible

Which of the following is not a part of the Test Implementation and Execution Phase

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Designing the Tests 

Which of the following techniques is NOT a White box technique?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Boundary value analysis

A Project risk includes which of the following:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Organizational Factors

In a risk-based approach, the risks identified may be used to :

i. Determine the test technique to be employed.

ii. Determine the extent of testing to be carried out.

iii. Prioritize testing in an attempt to find critical defects as early as possible.

iv. Determine the cost of the project

Correct

Well Done... 🙂

Incorrect

Correct Answer: - i, ii, iii are true and iv is false

Which of the following is the task of a Tester?

i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project.

ii. Prepare and acquire Test Data

iii. Implement Tests on all test levels, execute and log the tests.

iv. Create the Test Specifications

Correct

Well Done... 🙂

Incorrect

Correct Answer: - ii,iii,iv is true and i is false

The Planning phase of a formal review includes the following: -

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Selecting the personnel, allocating roles.

A Person who documents all the issues, problems and open points that were identified during a formal review.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Scribe

Who are the persons involved in a Formal Review: -

i. Manager

ii. Moderator

iii. Scribe / Recorder

iv. Assistant Manager

Correct

Well Done... 🙂

Incorrect

Correct Answer: - i,ii,iii are true and iv is false.

Which of the following is a Key Characteristics of Walk Through

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Scenario, Dry Run, Peer Group

What can static analysis NOT find? 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - memory leaks

Incidents would not be raised against:

Correct

Well Done... 🙂

Incorrect

Correct Anwer: -improvements suggested by users

A Type of functional Testing, which investigates the functions relating to detection of threats, such as virus from malicious outsiders. 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Security Testing

Which of the following is not a major task of Exit criteria?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Logging the outcome of test execution.

Testing wherein we subject the target of the test, to varying workloads to measure and evaluate the performance behaviours and the ability of the target and of the test to continue to function properly under these different workloads.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Load Testing

Testing activity which is performed to expose defects in the interfaces and in the

interaction between integrated components is: -

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Integration Level Testing

Static analysis is best described as:

Correct

Well Done... 🙂

Incorrect

Correct Answer: -The analysis of program code.

One of the fields on a form contains a text box which accepts alpha numeric values. Identify the Valid Equivalence class 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Boo01k

Reviewing the test Basis is a part of which phase

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Test Analysis and Design

Reporting Discrepancies as incidents is a part of which phase: -

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Test Implementation and execution

Which of the following items would not come under Configuration Management?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Live data

Handover of Testware is a part of which Phase

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Test Closure Activities

The Switch is switched off once the temperature falls below 18 and then it is turned on when the temperature is more than 21. When the temperature is more than 21. Identify the Equivalence values which belong to the same class.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - 22,23,24

 