The process starting with the terminal modules is called –

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Bottom-up integration

The inputs for developing a test plan are taken from

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Project plan

If an expected result is not specified then:

Correct

Well Done... 🙂

Incorrect

Correct Answer: -It may be difficult to determine if the test has passed or failed

Which of the following could be a reason for a failure

  1. Testing fault
  2. Software fault
  3. Design fault
  4. Environment Fault
  5. Documentation Fault
Correct

Well Done... 🙂  

Incorrect

Correct Answer: - All of them are valid reasons for failure

Test are prioritized so that:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - You find more faults

 Which of the following is not a static testing technique?

Correct

Well Done... 🙂

Incorrect

Correct Answer: -Walkthrough

Which of the following statements about component testing is not true

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Component testing should be performed by development

During which test activity could fault be found most cost-effectively?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Planning

Which, in general, is the least required skill of a good tester?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Able to write software

The purpose of requirement phase is 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - All of the above

Verification is: 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Checking that we are building the system right

A regression test:

Correct

Well Done.. 🙂

Incorrect

Correct Answer: -Will help ensure unchanged areas of the software have not been affected

Function/Test matrix is a type of 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Project status report

Defect Management process does not include 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Deliverable base-lining

What is the difference between testing software developed by contractor outside your country, versus testing software developed by a contractor within your country?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Cultural difference

Software testing accounts to what percent of software development costs?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - 40-50

A reliable system will be one that:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Is unlikely to cause a failure

How much testing is enough

Correct

Well Done... 🙂

Incorrect

Correct Answer: - The answer depends on the risks for your industry, contract and special requirements

Which of the following is not a characteristic for Testability? 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Robustness

Cyclometric Complexity method comes under which testing method.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - White box 

Which of these can be successfully tested using Loop Testing methodology?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - All of the above

To test a function, the programmer has to write a ______, which calls the function and passes it test data. 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Driver

Equivalence partitioning is:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - A black box testing technique appropriate to all levels of testing

When a new testing tool is purchased, it should be used first by:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - A small team to establish the best way to use the tool

Inspections can find all the following except 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - How much of the code has been covered