What is a failure?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Deviation from expected result to actual result

People who don’t participate in technical reviews

Correct

Well Done... 🙂

Incorrect

Correct Answer: -Management

What type of testing is done to supplement the rigorous testing?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Error Guessing

Capture and replay facilities are least likely to be used to ….  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - User requirements.

What is the smallest number of test cases required to Provide 100% branch

coverage?

If(x>y) x=x+1;

else

y=y+1;

while(x>y)

{

y=x*y; x=x+1;

}

Correct

Well Done... 🙂

Incorrect

Correct Answer: - 2

Cyclometric complexity is used to calculate

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Number of binary decisions + 1

If a candidate is given an exam of 40 questions, should get 25 marks to pass (61%) and should get 80% for distinction, what is equivalence class.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - 32,37,40

Match the following:

  1. Test estimation
  2. Test control
  3. Test monitoring
  1. measures of tracking process
  2. effort required to perform activities
  3. reallocation of resources
Correct

Well Done... 🙂 

Incorrect

Correct Answer : - 1-2, 2-3, 3-1

One of the following is not a part of white box testing as per BS7925-II standards.  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Syntax testing.

Exclusive use of white box testing in a test-phase will:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Run the risk that the requirements are not satisfied.

Match the following.

  1. Configuration identification
  2. Configuration control
  3. Status reporting
  4. Configuration auditing

           a.  Maintains of CI’s in a library.

           b. Checks on the contents of the library.

           c. Function recording and tracking problems.

           d. Requires all CI’s and their versions of the system are known.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - 1-d, 2-a, 3-c, 4-b.

Cost of the reviews will not include.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Tool support.

What type of testing will you perform on internet banking solution?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Non-functional testing.

Which tool will be used to test the flag memory leaks and unassigned pointers  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Dynamic analysis tool  

Which of the following is not included in Test Plan.

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Expected results.

A piece of software has been given? what tests in the Following will you

perform?

  1. Test the area’s most critical to business processes
  2. Test the areas where faults will be maximum
  3. Test the easiest functionalities
Correct

Well Done... 🙂

Incorrect

Correct Answer: - 1&2 are true and 3 is false. 

Amount of testing performed will not depend on  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Test data.

Which of the following provides the biggest potential cost saving from use of CAST?  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Test execution

Testing is not done to ….  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Improve software accuracy

Software quality is not relevant to …

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Viability

 

Which of the following is false?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Incidents can be analyzed to assist in test process improvement.

 

Which of the following is a type of non-functional testing?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Usability testing. 

To make a test effective it is most important that:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - The expected outcome is specified before execution.

Error guessing is:  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - The most appropriate way of deriving system tests.

A standard for software testing terminology is:  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - BS 7925-1

Which of the following is true of V-model?  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - It states that modules are tested against user requirements.

Which of the following is NOT part of a high-level test plan?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Analysis of Specifications.

When do you stop testing?  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - When the test completion criteria are met

Which of the following is least important in test management?  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - De-bugging.

How would you estimate the amount of re-testing likely to be required?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Metrics from previous similar projects. 

Which of the following statements is true of static analysis:  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Compiling code is not a form of static analysis. 

Regression testing always involves  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Testing whether modifications have introduced adverse side effects

A field failure occurs when multiple users access a system. Which of the following is true?  

Correct

Well Done... 🙂

Incorrect

Correct Answer: - This indicates an important non-functional requirement was not specified and tested.

Integration testing in the large involves:

Correct

Well Done... 🙂 

Incorrect

Correct Answer: - Testing the system when combined with other systems.

Data flow analysis studies:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - The rate of change of data values as a program executes.

The oracle assumption is that:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - The tester can routinely identify the correct outcome of a test.

The following text will be used in Next Two Questions. In a system designed to work out the tax to be paid:  

  1. An employee has $4000 of salary tax-free
  2. The next $1500 is taxed at 10%
  3. The next $28000 is taxed at 22%
  4. Any further amount is taxed at 40%
Correct
Incorrect

To the nearest $ which of these is a valid Boundary Value Analysis test case?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - $33501

Which of these groups of numbers would fall into the same equivalence class?

Correct

Well Done... 🙂

Incorrect

Correct Answer: -$5800; $28000; $32000

Which of the following is NOT a characteristic of User Acceptance Testing?

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Use of automated test execution tools. 

For software to be reliable it must:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Be unlikely to cause a failure.