Deliverables of test design phase include all the following except (Testing artefacts)

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Test summary report

Which of the following is not decided in the test-planning phase? (Testing

artefacts

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Types of test cases

Typical defects that are easier to find in reviews than in dynamic testing are:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - All of the above.

Load Testing Tools (Per. Testing)

Correct

Well Done... 🙂

Incorrect

Correct Answer: - all of the above

Reviews, static analysis and dynamic testing have the same objective : - 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - identifying defects.

Defect arrival rate curve: 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Shows the number of newly discovered defects per unit time

What are the 2 major components taken into consideration with risk analysis?(Test Mgmt)

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Both a and b

We can achieve complete statement coverage but still miss bugs because:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Both A and B

Who is responsible for conducting test readiness review? (Performing Test)

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Both A & B

What if the project isn't big enough to justify extensive testing? (Test Mgmt) 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Use risk based analysis to find out which areas need to be tested

What are the key features to be concentrated upon when doing a testing for world wide web sites (Test Execution) 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - All of the above

What can be done if requirements are changing continuously? (Test Mgmt)

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Both a and b

The selection of test cases for regression testing (Testing artifacts)

Correct

Well Done... 🙂

Incorrect

Correct Answer: - All of the above

Measurement dysfunction is a problem because:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Even though the numbers you look at appear better, to achieve these numbers, people are doing other aspects of their work much less well.

What do you mean by “Having to say NO” (test planning process)

Correct

Well Done... 🙂

Incorrect

Correct Answer: - No, the software is not ready for production

According to the lecture, there are several risks of managing your project's schedule with a statistical reliability model. These include (choose one or more of the following):

Correct

Well Done... 🙂

Incorrect

Correct Answer: - All of the above

Operations testing is (Performing Test)

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Ease of operations

Tools like change Man, Clear case are used as (test planning process)

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Configuration management tools

Important consequences of the impossibility of complete testing are (Choose one or more answers):

Correct

Well Done... 🙂

Incorrect

Correct Answer: - All of the above.

Which is not in sequence in 11 Step Software Testing process (Tester’s Role SDLC)

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Test software design

In the MASPAR case study:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - An error in the code was so obscure that you had to test the function with almost every input value to find its two special-case failures.

Complete statement and branch coverage means:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - That you have tested every statement and every branch in the program.

What if the project isn't big enough to justify extensive testing? (Test Mgmt)

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Use risk based analysis to find out which areas need to be tested

Security falls under (Performing Test)

Correct

Well Done... 🙂

Incorrect

Correct Answer: - compliance testing

Which is the best definition of complete testing:

Correct

Well Done... 🙂

Incorrect

Correct Answer: - You have reached the scheduled ship date.

What is the concept of introducing a small change to the program and having the effects of that change show up in some test? (Testing concepts) 

Correct

Well Done... 🙂

Incorrect

Correct Answer: - Introducing mutations 